Live energy · Plant A

Six zones. One power bill.

Every zone's live draw against its own baseline. One is running hotter than it should.

Plant total draw —
Injection Molding Bay
ZONE 1
—
On baseline
Paint Line
ZONE 2
—
On baseline
Compressor House
ZONE 3
—
Elevated
HVAC — Plant A
ZONE 4
—
On baseline
Packaging
ZONE 5
—
On baseline
Utilities Yard
ZONE 6
—
On baseline

↑ Tap Compressor House, or hit Next below

Zone 3 · Compressor House

Drawing more than it's producing.

Power draw hasn't dropped during scheduled idle windows for six shifts running.

Power draw — last 4 hrs LIVE
baseline · 34 kW
Elevated draw
46.2 kW
Current draw
0.81
Power factor
5h 42m
Continuous run

Zone 3 · Compressor House

18% above baseline — and it's not slowing down.

Consistent, not occasional. That pattern points to a mechanical cause, not a demand spike.

Baseline (last 30 days)34 kW avg
Current (last 6 shifts)40.1 kW avg
+18% for 6 days
Sustained above baseline through every idle window — projected at roughly $1,240 in extra energy cost this month if unaddressed.
Likely cause

Draw stays high even when downstream demand drops, consistent with a stuck unloader valve keeping the compressor loaded when it should be idling.

Outcome

One stuck valve, one avoidable bill.

An illustrative scenario based on typical compressed-air waste for a system this size.

Unaddressed
+18%
Above baseline, ongoing
$1,240/mo wasted
Fixed this week
Back to base
Unloader valve serviced
$0 ongoing waste
$14,880/yr saved
From this one zone, this scenario

Illustrative scenario, not a customer case study — Growspark is pre-launch. Real figures depend on your equipment, tariffs, and run schedule.

Want to see your own zones like this?

Tell us about your plant and we'll follow up.

See the predictive maintenance demo →